The J-2X engine before installation at the Stennis Space Center. Credit: NASA/SSC
Cool tech at NASA cutting manufacturing time from 9 months to 9 days. This is for the STS Senatorial(pork) Transportation System that I’ve no love for but proving tech like this is one of the ways that government R&D tax dollars provide broad value since success is not squirreled away as a trade secret.